Const. of formation in Embankment and Cutting, Blanketing, Rock cutting, Const. of Major & Minor Bridges, RUBs, ROBs, Const. of Drain/ Retaining wall, Ballast Supply and Removal of Infringements in Panvel-Karjat section in connection with Panvel – Karjat double line Suburban Corridor under MUTP-III in 2 LOTs. LOT-I: From Ch: 00+000 (Km) to Ch: 15+000 (Km).
Strengthening of existing bund along Gadhi River between Chainage 0 to 30 mtr. and 900 to 1150 mtr., R & R Pocket No.l at Karanjade, Pushpak Node, Navi Mumbai (Balance work)
Cut & Fill works at NMIA site.
Construction of C.C road from plot no 18 to survey no 797 (pmc water tank to ganesh mandir to lamer complex) Sai nagar in ward no 14
Reclamation in Sectors- 44 & 62 under 12.50% Scheme at Dronagiri.
Area leveling by Cutting & Filling of the area in Sect 17 at Ulwe, Navi Mumbai (2nd Call)
Widening of existing container road towards east side of Y-Junction to North Gate Complex in JN Port. (Thakur Mhatre (JV), 53%-47%) (Awarded Cost Rs.98.25 Cr.)