Development of 30 Mtrs wise eastern road with rock fill embankment and protection work on Gadi River Bankside for Navi Mumbai International Airport.

  • Client: CIDCO Ltd
  • Cost of Project: Rs. 3422 Lac

Construction of 60.0 mtrs. Wide road at the Southern Side of Navi Mumbai International Airport – Embankment Work.

  • Client: CIDCO Ltd
  • Cost of Project: Rs. 1618 Lac

Balance Integrated Development of R & R Pocket No. 1 upto Stage – I at Karanjade.

  • Client: CIDCO Ltd.
  • Cost of Project: Rs. 1920 Lac

Construction of Earthwork, Bridge work and L.C gate in between Jasai Yard to Holding Yard (From km. 85.678 to km.89.592) in Connection with 4th container Terminal at JNPT.

  • Client: RITES
  • Cost of Project: Rs. 2235.60 Lac

Land Development work (Package I + II) for Navi Mumbai International Airport including Ulwe River Diversion work. (1st Recall)TIPL-JMMIPL JV PVT. LTD (53%-47%) Awarded Cost-529.36 cr

  • Client: CIDCO
  • Cost of Project: Rs. 52937.01 Lac

Strengthening and Restructuring of yards behind Shallow Water Berth in JN Port (Thakur-Mhatre-Kharpatil (JV),, 35%-35%-30%) (Awareded Cost Rs. 114.99 Cr.)

  • Client: JNPT-PP&DD
  • Cost of Project: Rs. 11499 Lac

Development of land in Pushpak Node adjacent to NH-4B (South – East Side) near village Dapoli (Part-II) by including Land development works in R & R Pocket No. 4 & 5 at Vadghar & Karanjade
CA 02/CIDCO/SE(AIRPORT)/EE(AIRPORT-III)/2013-2014

  • Client: CIDCO
  • Cost of Project: Rs. 5585.00 Lac

Creation of Parking Area next to Port Users Building (PUB) in JN Port.

  • Client: JNPT
  • Cost of Project: Rs. 362.83 Lac

Construction of Anti Sea-Erosion Embankment along the Beach at Shrivardhan Tal. Shrivardhan, Dist Raigad.

  • Client: PWD Mahad
  • Cost of Project: Rs. 1043.29 Lac

Nerul/Belapur-Seawood-Uran Railway Project: Earthwork in embankment including top blanketing layer sand layer provision pf PVC band drain, Geo textile, pre loading at embankment construction of minor bridges, drains & track maintenance for Ch.19000 to Uran road ( Upto Ch.22500) for the project.

  • Client: Central Railway
  • Cost of Project: Rs. 2260.86 Lac