Completed Project

Widening and Construction of MIDC road from Taloja MIDC Road to Ambernath-Katai Naka Road

  • Client: MMRDA
  • Cost of Project: Rs. 7681.63 Lac

MIDC Patalganga Industrial Area….
Const. of Cement Concrete roads from Bombay Dying/Reliance Industries to Jindal Company
Agreement No. B-2/29 for 2018-2019

  • Client: MIDC, Patalganga
  • Cost of Project: Rs. 4228.14 Lac

Development of Integrated Infrastructure works in Sect 13, Gavhan under 12.5% Scheme at Ulwe, Navi Mumbai.
CA: 04/CIDCO/SE(K,U & D)/EE(UL-III)/2018-19

  • Client: CIDCO Ltd.,
  • Cost of Project: Rs. 1418.77 Lac

Resurfacing of roads in Sect. 12 to 19 at New Panvel (E), Navi Mumbai.

  • Client: CIDCO ltd.
  • Cost of Project: Rs. 826.20 Lac

Development of 30 Mtrs wise eastern road with rock fill embankment and protection work on Gadi River Bankside for Navi Mumbai International Airport.

  • Client: CIDCO Ltd
  • Cost of Project: Rs. 3422 Lac

Const of Kamothe Balance work of Flyover Mumbai bound slip lane Road PQC pavement including const. of 3 Twin Box cell culvert, box drain and other allied works etc Sion-Panvel BOT Project Balance Work.

  • Client: PWD Mumbai
  • Cost of Project: Rs. 898.12 Lac

Construction of Bridge on stilt in Mangrove portion for proposed MSETCL & Tata Power EHVT line rerouting for Navi Mumbai International Airport Project, Navi Mumbai. ( 1st Extension).MHATRE-THAKUR JV 51%-49%

  • Client: CIDCO Ltd.
  • Cost of Project: Rs. 13488 Lac

Construction of Bridge on diverted Ulwe River (proposed) near village Vahal for proposed MSETCL EHVT line rerouting for Navi Mumbai International Airport Project, Navi

  • Client: CIDCO Ltd
  • Cost of Project: Rs. 1339 Lac

Construction of 60.0 mtrs. Wide road at the Southern Side of Navi Mumbai International Airport – Embankment Work.

  • Client: CIDCO Ltd
  • Cost of Project: Rs. 1618 Lac

Balance Integrated Development of R & R Pocket No. 1 upto Stage – I at Karanjade.

  • Client: CIDCO Ltd.
  • Cost of Project: Rs. 1920 Lac