Const of Kamothe Balance work of Flyover Mumbai bound slip lane Road PQC pavement including const. of 3 Twin Box cell culvert, box drain and other allied works etc Sion-Panvel BOT Project Balance Work.
Construction of Bridge on stilt in Mangrove portion for proposed MSETCL & Tata Power EHVT line rerouting for Navi Mumbai International Airport Project, Navi Mumbai. ( 1st Extension).MHATRE-THAKUR JV 51%-49%
Construction of Bridge on diverted Ulwe River (proposed) near village Vahal for proposed MSETCL EHVT line rerouting for Navi Mumbai International Airport Project, Navi
Providing road for Rerouting of MSETCL EHVT line parallel to Amra Marg from Vahal village to PCB Bridge End.
Construction of Earthwork, Bridge work and L.C gate in between Jasai Yard to Holding Yard (From km. 85.678 to km.89.592) in Connection with 4th container Terminal at JNPT.
Construction of R. C. C. skew bridges/ culverts over S. W. channel in sector 1 to 6 at Karanjade, Taluka Panvel, Navi Mumbai.
Construction of 5 Nos. of RCC Bridges on 35/50 Mtrs. Wide Channel at various locations at Ulwe Node, Navi Mumbai.
Nerul/Belapur-Seawood-Uran Railway Project:- Construction of two commuter subway at proposed Targhar Railway Station in Navi Mumbai including earthwork in approaches of these subways.
Nerul/Belapur-Seawood-Uran Railway Project: Construction of Minor Bridge at Ch. 7750,8100,11100,11760,13006 & 13325, ( Hume pipe Culvert, RCC Slab & RCC Box) & retaining Wall from Ch. 11000 to Ch. 11120 incl. earthwork in approaches of these Bridges…..AGREE.NO.:Dy.CE/C/JNJ/BSU/2011/2
Nerul/Belapur-Seawood-Uran Railway Project: Construction of one Major Bridge at Ch. 6120, 4 Road Under Bridges ( RUBs) at Ch. 5315, Ch. 6175, Ch. 7890 & Ch. 4000 and extension of Minor Bridges including arthwork in approaches of Bridges of the Project….AGREE NO.MT/W/R/BSU/35