Completed Projects
Construction of School Building on Plot No. 17 at Sector R2 at R & R Pocket No 1 & 2 at Karanjade, Navi Mumbai.
Construction of 5 Nos. of RCC Bridges on 35/50 Mtrs. Wide Channel at various locations at Ulwe Node, Navi Mumbai.
Setting up Greenfield facility for production of 65000 m3/A of Lube Oils and with provision for expansion to 80000 m3/A of Lub Oils at Additional MIDC, Patalganga, Dist. Raigad.
Infrastructure works for the Development of the 4th Container Terminal in Jawaharlal Nehru Port (JNPT)
Construction of Road From Shell & Pearl Ceramics Ltd., to Kamani Daykem Pvt. Ltd., (Plot No. C-395 to D-55) at TTC Industrial Area, Turbhe.
JNPT Pkg – I, Collection of user Fee through User Fee Collection Agency on the basis of competitive bidding at Km 13.050 (Chirle Toll Plaza) and Km 23.250 (Karanjada Toll Plaza) for Km 5.000 to Km 26.987 and from Km 0.000 to Km 4.440 of NH 4B and Km 106.000 to Km 109.500 of NH-4 in the State of Maharashtra.
Development of land in Pushpak Node adjacent to NH-4B (South – East Side) near village Dapoli (Part-II) by including Land development works in R & R Pocket No. 4 & 5 at Vadghar & Karanjade
CA 02/CIDCO/SE(AIRPORT)/EE(AIRPORT-III)/2013-2014Integrated Development of Infrastructure works under 12.5% Scheme in Sec. 9, at Ulwe, Navi Mumbai.
Integrated Development of Infrastructure works in Sec 10B & Const. of S. W. Drain along 24m & 15 m wide roads in Sec. 19B, Ulwe, Navi Mumbai.
Bid Package No. PL-INFRA-WSC Civil works for Const. Of West Side Connectivity at Palace Garden Panvel SEZ