Ongoing Projects
Const. of formation in Embankment and Cutting, Blanketing, Rock cutting, Const. of Major & Minor Bridges, RUBs, ROBs, Const. of Drain/ Retaining wall, Ballast Supply and Removal of Infringements in Panvel-Karjat section in connection with Panvel – Karjat double line Suburban Corridor under MUTP-III in 2 LOTs. LOT-I: From Ch: 00+000 (Km) to Ch: 15+000 (Km).
Construction of Compound Wall, Guard Blocks, Gates and External Development woks for proposed centre of excellence in International Corporate Park (ICP) at Kharghar, Navi Mumbai.
Strengthening of existing bund along Gadhi River between Chainage 0 to 30 mtr. and 900 to 1150 mtr., R & R Pocket No.l at Karanjade, Pushpak Node, Navi Mumbai (Balance work)
Integrated infrastructure development for balance lane of 35 m. wide CISF road and shifting of existing sewer line within and along Centre of Excellence (COE) in International Corporate Park (ICP) at Kharghar, Navi Mumbai.
Cut & Fill works at NMIA site.
Widening of existing container road towards east side of Y-Junction to North Gate Complex in JN Port.( Thakur – Mhatre JV having share of 53% & 47%) ( Awarded Cost Rs. 98.24Cr.)
Construction of C.C road from plot no 18 to survey no 797 (pmc water tank to ganesh mandir to lamer complex) Sai nagar in ward no 14
Construction of 24m wide CC road, adjoining storm water drain and construction of bridge over cidco Holding pond and other ancillary works as per development plan for the rental housing scheme at rohinjan village in Panvel municipal corporation.
Reclamation in Sectors- 44 & 62 under 12.50% Scheme at Dronagiri.
Const. of Foot over Bridges(FOB’s) Cover-over-platform(COP), structures & service bridges like booking office etc.@Ranjanpada & Dronagiri station in connection with Nerul/Belapur-Seawood-Uran Railway Project.
CA NO. CE/BSU/2017/02 Dt. 11.09.2017
(45% Share of TIPL)